Author Topic: Why scheduled verify sync task only going through small percentage of the pool?  (Read 479 times)

Offline pooler1

  • Jr. Member
  • **
  • Posts: 78
  • Karma: +0/-0
    • View Profile
I just checked my logs for scheduled tasks.  I have a 23+ TB pool, and the scheduled verify sync task is only going through 700GB of it.  Why?

Offline TheKLF

  • Newbie
  • *
  • Posts: 24
  • Karma: +1/-0
    • View Profile
There is a setting called "Scheduled Range Operation" that is set to 100GB by default.  If you setup a scheduled task for the array, each time the task runs it will process the amount set by this setting.  So for a 30TB array, if you leave the default at 100GB it will take ~ 30 runs of the task to do a complete sync.